0
Intel Panther Lake CPU & PCI IDs Listed: A0 & B0 Stepping With Next-Gen GT3 & GT2 iGPUs

Intel Panther Lake CPU & PCI IDs Listed: A0 & B0 Stepping With Next-Gen GT3 & GT2 iGPUs

The CPU and PCI IDs of Intel's next-generation Panther Lake CPUs in A0 and B0 stepping are revealed along with GT3 and GT2 tier iGPUs.

Intel's Next-Gen Panther Lake CPUs Spotted: A0 and B0 Step Up to Celestial “GT3” and “GT2” Tier Xe3-LPG iGPUs

Intel's next-generation Panther Lake CPUs are expected to debut in the second half of 2025 with production plans on the 18A process node expected in the first half of 2025. Clearwater Forest E-Core being the only Xeon family.

Last month, Intel Confirmed that its Panther Lake CPUs were already in fabs and on track for a mid-2025 launch. Based on the information we have right now, these chips will use Cougar Cove P-Core architecture and Skymont E-Core architecture. They will house an advanced NPU that will provide 2x AI TOPs compared to Lunar Lake. Which itself is expected to offer more than 100 platform AI TOPs. Intel is also expected to use its own Intel 3 process node for the SOC tile while the iGPU tile is expected to be fabricated using an external node from TSMC, most likely the N3 or N3.

Image source: Korbot

The graphics tile on Intel Panther Lake CPUs is going to be quite interesting. Despite rumors suggesting that Intel has pulled back on its discrete GPU development.will continue to stay on track with the integrated graphics segment. Celestial “Xe3” is the most likely candidate for next generation CPUs.. Intel's Arc Celestial GPU architecture is going to be a follow-up to its Battlemage “Xe2-LPG” architecture. Debut on Lunar Lake CPUs later this year.

So coming back to the IDs, it looks like Intel already has the first A0 and B0 ready to step on the Panther Lake CPU as they are now listed with their respective IDs of “0xC06C0” and “0xC06C1”. Is. Core bot.

Image source: Korbot

Apart from these, PCI IDs are also listed for iGPUs that come in GT3 and GT2 flavors. Note that these IDs are only for the Panther Lake-P chips that are going to be the standard mobile lineup. Intel Panther Leak-U chips have also been spotted in leaked test tools a while back.. In addition to these, Lunar Lake-M chips are also listed with their respective GT2 “Battlemage Xe2-LPG” IDs. The Lunar Lake CPU has two A0 steppings including “0xb06d0” and 0xb06d1.

This year, Intel is going to focus mostly on its Arrow Lake and Lunar Lake “Core Ultra 200” series chips, so we're likely to hear more about Panther Lake CPUs by CES 2025. It seems like everyone is rushing to talk about their next-generation AI PC platforms.

Intel Mobility CPU Lineup:

CPU family Panther Lake Lunar Lake Arrow Lake Meteor Lake Raptor Lake Alder Lake
Process Node (CPU tile) Intel 18 A Intel 20 A Intel 20 A Intel 4 Intel 7 Intel 7
Process Node (GPU Tile) TSMC 3/2nm? TSMC 3nm? TSMC 3nm TSMC 5nm Intel 7 Intel 7
CPU architecture Hybrid Hybrid Hybrid (four cores) Hybrid (Triple Core) Hybrid (dual core) Hybrid (dual core)
P core architecture Cougar Coo Lion Cove Lion Cove Redwood Cove Raptor Cove Golden Cove
E Core Architecture Skymont? N/A Skymont Crestmont Gracemont Gracemont
LPE Core Architecture (SOC) Skymont? Skymont Crestmont Crestmont N/A N/A
Top configuration TBD 4+4 (MX Series) TBD 6+8 (H-Series) 6+8 (H-Series)
8+16 (HX-Series)
6+8 (H-Series)
8+8 (HX-Series)
Maximum cores/threads TBD 8/8? TBD 14/20 14/20 14/20
Planned lineup H/P/U series V series H/P/U series H/P/U series H/P/U series H/P/U series
GPU architecture Xe3-LPG (sky) Xe2-LPG (Battlemage) Xe-LPG (Alchemist) Xe-LPG (Alchemist) Iris Xe (Gen 12) Iris Xe (Gen 12)
GPU execution units TBD 64 European Union 192 European Union 128 EUs (1024 cores) 96 EUs (768 cores) 96 EUs (768 cores)
Memory support TBD LPDDR5X-8533 TBD DDR5-5600
LPDDR5-7400
LPDDR5X – 7400+
DDR5-5200
LPDDR5-5200
LPDDR5-6400
DDR5-4800
LPDDR5-5200
LPDDR5X-4267
Memory Capacity (Maximum) TBD 32 GB TBD 96 GB 64 GB 64 GB
Thunderbolt ports TBD TBD TBD 4 (TB4) 4 (TB4) 4 (TB4)
Wi-Fi capability TBD Wi-Fi 7 TBD Wi-Fi 6E Wi-Fi 6E Wi-Fi 6E
TDP TBD 17-30W TBD 7W-45W 15-55W 15-55W
Launch. 2 AH 2025 2 AH 2024 2 AH 2024 2 AH 2023 1H 2023 1 AH 2022

News Source: InstLatX64

Share this story.

Facebook

Twitter

About the Author

Leave a Reply